Project name
Baku - Tbilisi - Ceyhan Crude Oil Pipeline and Ceyhan Terminal Marine and Land Works Construction
Project Location
Botaş Facilities Ceyhan / ADANA
Employer
BP - British Petrolium
Contractor
TEKFEN Construction and Installation Co. Inc.
Start and End Date
2004 - 2005
Total Concrete Amount 135.000 m³ Concrete Classes and Amount C14 - C 40/55
For durability on this project, micro-silica was used in C 30 and C 35 concretes poured on land and at sea. These concrete types were used in line with the conditions of a maximum 15 mm pressurized water permeability as per the DIN 1048 standard and a maximum 1200 Coulombs rapid chloride permeability as per the ASTM C 1202 standard.